Other equipment used in fitting renewable energy heating systems
Showing all 6 results
The screw-in 3Kw immersion heaters from Austria Email “SH” series are designed for additional heating or emergency heating of water in closed containers.
The 1½” brass screw head makes it easy to retrofit the water heaters.
Key features:
Please note other sizes available on request at sales@biomasssupplies.co.uk
Further technical information about the Immersion Heater SH series can be found in the installation guide
The screw-in 3Kw immersion heaters from Austria Email “SH” series are designed for additional heating or emergency heating of water in closed containers.
The 1½” brass screw head makes it easy to retrofit the water heaters.
Key features:
Please note other sizes available on request at sales@biomasssupplies.co.uk
Further technical information about the Immersion Heater SH series can be found in the installation guide
The Chimney fan’s purpose is to take the fumes out of the log boiler when the door is opened when loading fuel.
WKO fans are great for efficiency, low volume and weight.
Engine Rotation Speed | 2760 | trn/min |
Engine power | 19 | W |
Power Rating | 38 | W |
Inlet-outlet diameter | 200 | mm |
Rotor exterior diameter | 175 | mm |
Weight (excluding engine) | 14 | kg |
Weight (including engine) | 16.5 | kg |
Max temperature | 300 | °C |
Max fan efficiency | 400 | m3/h |
Inlets and outlets compression: 28mm
Opening temperature: 72 oC
Weight: 6.6 kg
Boiler nominal heating power: up to 60 kW
Key features:
Charging is continued by means of a slow flow of hot water.
During the final part of the burn-out the Laddomat 21-60 charges the storage tank fully due to the unique thermal valve, which closes the bypass opening completely.
When the fire has gone out, the Laddomat makes use of the remaining heat in the boiler and ember by the self-circulation of hot water from the top of the boiler into the storage tank.
In the event of a power failure Laddomat 21-60 starts charging the container immediately by self-circulation.
The same happens if the pump breaks down. Reverse circulation is prevented during periods of non-firing, which means almost no loss of heat.
The laddomat comes with a 24 month warranty
Inlets and outlets compression: 1 1/4″ F
Opening temperature: 72 oC
Weight: 8.9 kg
Boiler nominal heating power: up to 120 kW
Key features:
Charging is continued by means of a slow flow of hot water.
During the final part of the burn-out the Laddomat 21-100 charges the storage tank fully due to the unique thermal valve, which closes the bypass opening completely.
When the fire has gone out, the Laddomat makes use of the remaining heat in the boiler and ember by the self-circulation of hot water from the top of the boiler into the storage tank.
In the event of a power failure Laddomat 21-100 starts charging the container immediately by self-circulation.
The same happens if the pump breaks down. Reverse circulation is prevented during periods of non-firing, which means almost no loss of heat.
The laddomat comes with a 24 month warranty
A Freshwater Module installed in conjunction with buffer tank allows the energy stored in the buffer to be transferred to the cold mains water through a plate heat exchanger. A flow switch signals that heat is required and a pump runs to charge the primary side of the plate heat exchanger.
Key features:
Rated Performance: 40 l/min
Max Operating Temperature (primary): 95°C
Max Operating Temperature (Secondary): 95°C
Max Operating Overpressure (primary): 3 bar
Max Operating Overpressure (Secondary): 6 bar
Dimensions: 490 x 637 x171 mm
Further technical data can be found in the installation brochure
Showing all 6 results
Unit 16, Whitegates Business Park,
Lenzie Road,
Kirkintilloch,
East Dunbartonshire,
G66 3BQ
e: enquiries@vpsplumbing.co.uk
p: 0141 459 3141